Sector: Education
Client: Vinci Construction
Detailed design and delivery of a three-storey, 3,000sqm teaching block at Harris Girls Academy, East Dulwich.
The extension accommodates English, ICT, Mathematics, Buisness Studies, Design and Technology. Environmental considerations on this project include natural ventilation using a wind catcher system a biomass boiler and the provision of bat boxed to encourage the protection of species to roost. A BREEAM score of Very Good was achieved.